peach info Homepage
Forum Home Forum Home > Clients and Guests > Q&A Clients & Guests
  New Posts New Posts
  FAQ FAQ  Forum Search   Register Register  Login Login

Kit Costing

 Post Reply Post Reply
Author
Message Reverse Sort Order
peach View Drop Down
Admin Group
Admin Group

THE BOSS

Joined: 01-Jan-2006
Status: Offline
Points: 1295
Post Options Post Options   Thanks (0) Thanks(0)   Quote peach Quote  Post ReplyReply Direct Link To This Post Topic: Kit Costing
    Posted: 25-Aug-2010 at 01:37
You should not need to run the F8 key in the Kit Control screen. Costings should flow through from the components to the Kit as it is sold. 
 
By default the Kits are costed from the Last Cost of the Components. 
There is a tick in SetupOptions > Product Tab to cost Kits on Average. If you tick this you may not see the correct cost in the Kit Control screen but it will appear in the Product control screen.
 
When a Kit is manufactured through the goods in screen the Last and average price are updated from the AveCost of the components by default.
 
If you manufacture a KIT from the Kit Manufacture screen the average price of the components will be used regardless of the settings. And it will update to the Last and Ave cost of the Kit on completion.
 
Prior to 99701 When you Manufacture a kit during a sale it would use the last cost of the kit to cost the sale. This has been changed in 99701 to calculate the cost from the average cost components on the fly.
 
Note****   If Some of the components of the kit are ticked Zero, their cost will not add to the toatal cost of the tick. 
 
 


Edited by peach - 13-Apr-2011 at 01:11
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 11.04
Copyright ©2001-2015 Web Wiz Ltd.

This page was generated in 0.078 seconds.